The Client had a design to pin down the pumps with piles, however installation was impeded by ice surrounding the pumps. Rally was engaged to investigate a potential solution(s) to solve this issue.
Rally provided the Client with a design basis memorandum (DBM) developing a solution and ensured there were no other more economically viable options.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!