A new 10” premium diesel fuel header was constructed from the existing filter to the rail loading facility. New structural steel, including a new bridge over the existing rail spurs, was required to support the piping.
An electrical load study indicated that upgrades were necessary to the existing electrical distribution system. Rally engineered the purchase requirements for a new transformer and an associated switchboard.
Completed detailed construction work packages (CWPs) and provided contractor RFI support for all CWPs.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!