Budget:
$4.8M TIC
Category:
Oil Sands & SAGD
Location:
Alberta
Download PDF

Scope

Rally completed hydraulics on the options to determine the optimal flow path to the observation well. Process calculations confirmed that additional cooling was required to ensure the disposal water stayed below the maximum temperature allowed on the existing piping section. The mechanical team assessed what was necessary to meet CSA Z662 requirements. Freeze protection, buoyancy, and cathodic protection were considered in the pipeline design. Impacts to the existing electrical infrastructure were assessed, and necessary modifications were added to the scope. The scope also included assessments to ensure the existing control systems could accommodate the new automation and instrumentation requirements.

Deliverables

A Scoping Study report and DBM report, complete with capital cost estimates, were completed prior. As part of the DBM scope, a project risk register was developed and maintained. A project milestone schedule was developed as part of the DBM.  Value engineering was utilized to consider methods to save on capital and operating costs.

Let's Get Started

Build With Rally Today

Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!

Our Work

View Our Projects

View More Work