Rally provided multi-discipline engineering support to an existing gas facility located in Sarnia, Ontario.
Detailed engineering, construction support and commissioning support for the installation of a new site flare knock-out skid.
Process Review of the existing glycol dehydration facility to determine maximum capacity of the facility and highlight system bottlenecks to achieve maximum capacity and define corrective actions.
Process Review and calculations for a throttling valve replacement.
Conversion of site P&IDs; generated related site PFDs.
Process Review to evaluate and ensure the primary station blowdown silencer, and associated header piping, is adequately sized to safely and efficiently vent station piping when required.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!