Emergency Tailings Line Bypass

View All Projects

Project Overview

Budget:
$1.6M TIC
Category:
Oil Sands & SAGD
Location:
Alberta
Download PDF

Scope of Work

Rally defined the basic process requirements, revised the P&IDs, facilitated the HAZOP, completed piping layouts, analyzed the piping stresses, and engineered the structural supports and anchors for the final routing.  Rally also issued engineering work packages (EWPs) to the fabricators, and provided RFI and construction support.

Deliverables

• Developed 3D piping and 3D civil models to support the design.

• Completed a stress analysis of the piping system including pump nozzle loads and piping constraints (i.e., anchors and guides).

• Facilitated a process hazard assessment (HAZOP).

• Facilitated a 3D model and constructability review.

• Developed a bill of materials to quickly procure materials.

• Developed drawings for pipe spool pre-fabrication.

• Registered the changes to the original pressure piping design with the provincial authority.

• Provided home office RFI support.

Let's Get Started

Build With Rally Today

Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!

Our Work

View Our Projects

View More Work