Rally provided multi-discipline engineering support to an existing pipelines company with assets across Ontario.
prepared an engineering work package (EWP) to replace an existing process control valve (PCV) at several existing terminal sites. This included specification of a new valve and actuator to meet existing process conditions. The new actuator required new programmable logic controller (PLC) infrastructure, wiring, and power details.
Bypass Piping: EWP for the replacement of a length of station bypass piping at one of the existing terminal sites.
Terminal 8 Injection Valve Replacement: IFC drawings for a CWP for the replacement and relocation of two injection valves on an existing pipeline.
Line Piping Stress: Mechanical/ piping system stress analysis to ensure the modifications being requested by the Owner’s Maintenance and Operations groups.
Switchrack Replacement: Detailed engineering services for the replacement of an existing switchrack system.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!