Project Overview

Budget:
$75k TIC
Category:
Other
Location:
New Brunswick
Download PDF

Detailed Engineering

Rally recommended that the existing storage tank infrastructure be re-used with new piping installed between the storage tank and mixing room area. With the new piping system, the Client was able to eliminate the manual handling of ethyl acetate, reducing labor requirements and spill risks. The piping system was installed at considerably less cost than a new storage tank.

Scope of Work

• Process / Mechanical:   Evaluation of existing transfer pump capacity and completion of process safeguarding review.

• Piping:   Design of new ethyl acetate transfer piping from existing transfer pump to mixing room area.

• Electrical:  Cable tray routing and cabling design for connection of new process instruments and field devices to existing PLC system.

• I&C:   Specification and selection of new process instruments, PLC and HMI programming of new ethyl acetate transfer system.