New piping was constructed above grade to several existing gasoline production tanks. Related upgrades were made to the existing site electrical and controls systems.
Process: IFC P&IDs, LDT, process design criteria, operating philosophy, HAZOP report, updated block flow diagrams.
Mechanical: New API 610 pump and static mixer material requisitions (MRs), bid evaluations, and post-award support. Produced CWPs for piping construction and pump installation. Registered piping system changes with TSASK.
Piping: 3D piping and pump layout models. Produced piping isometric drawings and tie point lists for CWPs, and developed MTOs to support TIC estimate.
Electrical: Single line diagrams, hazardous location drawing, key plan drawings, cable and panel schedules, schematic diagrams for pumps, MOVs, lighting controllers, wiring diagrams, and installation detail drawings for CWPs.
I&C: Process control narrative, cause & effect matrix, instrument index, MRs, datasheets, loop drawings, and instrument location plans for a CWP. LAN/network/control system architecture and fiber optic drawings.
Civil/Structural: Drawings for earthworks, piles and foundations, structural steel, 3D models for piles, and concrete foundations.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!