Install Hydrogen Jumpover Line

View All Projects

Project Overview

Budget:
$500k TIC
Category:
Refining & Petrochemicals
Location:
Saskatchewan
Download PDF

Scope of Work

Special emphasis was placed on ensuring that the new jump-over valves would be quickly accessible from existing platforms in the event of a compressor trip.

At the Client’s request, the installation of new flanges was kept to an absolute minimum. This eliminated potential hydrogen leak-points.

Deliverables

Rally revised the plant piping &instrumentation diagrams (P&IDs) and facilitated a process hazard analysis(PHA). This ensured that any new risks of misdirected flow were understood and safely mitigated.

Rally provided detailed engineering services, producing a multi-discipline construction work package (CWP).