Special emphasis was placed on ensuring that the new jump-over valves would be quickly accessible from existing platforms in the event of a compressor trip.
At the Client’s request, the installation of new flanges was kept to an absolute minimum. This eliminated potential hydrogen leak-points.
Rally revised the plant piping &instrumentation diagrams (P&IDs) and facilitated a process hazard analysis(PHA). This ensured that any new risks of misdirected flow were understood and safely mitigated.
Rally provided detailed engineering services, producing a multi-discipline construction work package (CWP).