Lift Station Access Road

View All Projects

Project Overview

Budget:
$2.5M TIC
Category:
Oil Sands & SAGD
Location:
Alberta
Download PDF

Scope

The scope included detailed engineering of a 5m wide, single-lane, gravel surface access road, approximately 455m in length.  The road ran from an existing secondary access road, along an existing construction road alignment, and connected to a lifting station area.

The final design is a combination of re-grading of an existing road alignment and construction of an all-new section of roadway.  The new road includes a turn-around in front of the lifting station.

Deliverables

Rally provided a design basis document with a road construction work package (CWP), complete with site plan, road plan profile, and road sections & detailed drawings.  

Rally used Civil 3D software to develop a digital terrain model, enabling the calculation of cut and fill quantities and volumes of imported materials for the project.  The deliverables also included a review of the surface area water runoff and the necessary hydrology calculations.

Let's Get Started

Build With Rally Today

Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!

Our Work

View Our Projects

View More Work