Oil Sands TFT Reclaim Water Barge

View All Projects

Project Overview

Design, procurement, construction, and commissioning of a barge to reclaim water from an oilsands plant’s Thin Fine Tailings (TFT) storage pond.

Budget:
$15M TIC
Category:
Oil Sands & SAGD
Location:
Alberta
Download PDF

Engineering Design & Services

The barge was designed for extreme northern winter cold conditions, and work was completed in accordance with robust oilsands industry standards. Rally’s design scope included:

• Confirmation of process hydraulic design.

• Specification and selection of TFT pumps and auxiliary systems.

• Design calculations including thermal stress and transient analysis (i.e., water hammer).

• Detailed engineering work packages for: piping and mechanical systems, pump intake structures, pump house building, HVAC systems, and electrical distribution and control systems.

• Material take-offs.

• QA/QC of engineering and design documents.

Additional Management Services

In addition to the design work, Rally provided project planning, scheduling, and procurement services plus field support during barge fabrication, assembly, launch and commissioning.

Let's Get Started

Build With Rally Today

Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!

Our Work

View Our Projects

View More Work