Pipeline Metering Project

View All Projects

Project Overview

Budget:
$40M TIC
Category:
Pipeline Facilities
Location:
Alberta
Download PDF

Scope of Work

Construction work packages (CWPs) defined modifications and new infrastructure required at the station to comply with the royalty metering requirements. Consideration was made to ensure space allowance of the metering assets for future expansion of up to 1,000 kbpd.

Deliverables

• All multi-discipline engineering CWPs and material requisitions (MRs).

• A steady state hydraulic analysis to determine the required battery limit pressure required to overcome the additional pressure loss associated with the facility upgrades.

• Engineering and design support for the preparation of all permits and regulatory submissions, and responses to information requests from regulatory bodies.

• A Class III cost estimate, refreshed in parallel with the detailed design.