Replace HP Hot Separator Control Valves

View All Projects

Project Overview

Budget:
$250k TIC
Category:
Refining & Petrochemicals
Location:
Saskatchewan
Download PDF

Scope of Work

The Client requested Rally to develop a feasibility study, exploring three potential valve replacement scenarios.  Reconfigured piping and structural supports were modeled in significant detail, given the complexity of the system.  This led to high confidence in the requested +/-30% cost estimate for each option.  The extra up-front scoping effort was realized as a cost saving in the detailed engineering phase.

Deliverables

• Detailed critical stress analysis.

• Custom pipe supports and structural checks.

• 3D modeling to avoid clashes between the larger, heavier new valve and the existing equipment.

• Isometric piping drawings and model shots.

• Registered the pressure piping design modifications with provincial authorities on the Client’s behalf.