Replacement of a decommissioned 25,000 barrel storage tank with a new 50,000 barrel swing tank.
The original tank was demolished and hauled away. Live piping adjacent to the original tank was relocated to a new inter-connected valve station outside of the tank berm. A new cone roof tank was constructed with piping, electrical, and instrument connections. The surrounding berms were upgraded for spill containment and vehicular access, and the finished surface of the tank cell was regraded towards a new drainage sump.
Construction work packages (CWPs) were delivered for tank demolition, new tank completions, earthworks, concrete /piling, grouting, structural steel, electrical, and instrumentation work.
Material requisitions (MRs) were delivered to enable the purchase of the new API 650 tank, stairs, and rooftop platform; miscellaneous piping specialty items; tank cathodic protection system; and various tank instrumentation.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!