.png)
Scope of Work
The TRO process involves introducing a polymer flocculant into the MFT using in-line mixing. The mixture is then deposited in thin layers across the drying fields resulting in rapid drying of the MFT. Rally worked with the client to develop / expand four of their drying fields.
Projects
• Heavy civil works to develop the drying fields and water ponds.
• Process / mechanical design of the TRO pumping and piping systems including over 30km of 12” tailings line.
• Installation of a new polymer injection skid as a pilot installation.
• Electrical power supply to the drying fields / equipment.
• Barge anchor designs.
.png)


Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!