Tailings Recovery Operations

View All Projects

Project Overview

Budget:
$40M TIC
Category:
Oil Sands & SAGD
Location:
Alberta
Download PDF

Scope of Work

The TRO process involves introducing a polymer flocculant into the MFT using in-line mixing. The mixture is then deposited in thin layers across the drying fields resulting in rapid drying of the MFT.  Rally worked with the client to develop / expand four of their drying fields.  

Projects

• Heavy civil works to develop the drying fields and water ponds.

• Process / mechanical design of the TRO pumping and piping systems including over 30km of 12” tailings line.

• Installation of a new polymer injection skid as a pilot installation.

• Electrical power supply to the drying fields / equipment.

• Barge anchor designs.

Let's Get Started

Build With Rally Today

Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!

Our Work

View Our Projects

View More Work