Scope was to replace a decommissioned 80,000 barrel storage tank with a new tank of equal size.
The original out-of-service tank was emptied, cut apart, and hauled away. Anew tank was constructed atop a new tank pad foundation. A cathodic protection system and a Teranap elastomeric bitumen geomembrane liner were built into the granular foundation. The surrounding berms were reshaped for erosion protection, and the finished surface of the tank cell was regraded towards anew drainage sump.
Construction Work Packages (CWPs) were delivered for tank and piping demolition, new tank completions and piping connections, earthworks, concrete / piling, grouting, structural steel, electrical and instrumentation work. Rally provided construction support for all CWPs. Material Requisitions were delivered to enable the purchase of the new API 650 tank, stairs, and rooftop platform; miscellaneous piping specialty items; tank cathodic protection system.
Ready to work with the leading provider of engineering, procurement, and construction management services? Join Canada’s largest infrastructure-building companies, and partner with Rally today!