Wedge Plug Valve Replacement

View All Projects

Project Overview

Budget:
$1.3M TIC
Category:
Refining & Petrochemicals
Location:
Saskatchewan
Download PDF

Deliverables Stage I

Evaluate a short-term solution of adding steam purge lines to the existing wedge plug valve.

• Confirmed that the existing valve is suitable for steam purging.

• Identified steam, condensate, and blowdown tie-ins via discussions with operations and by red-lining the piping and instrumentation diagrams (P&IDs).

• Optimized the routing and support of the new steam and condensate piping.

Deliverables Stage II

Facilitate a long-term solution of replacing the wedge plug valve with a more modern valve.

• Defined the specifications for the new valve.

• Determined the extent of piping and structural modifications needed to install the new valve.

• Defined the E&I scope required to integrate the new valve and actuator into the existing control system.

• Submitted a scoping study report and schedule.

• Provided a Class 4 capital cost estimate (CAPEX).