Evaluate a short-term solution of adding steam purge lines to the existing wedge plug valve.
• Confirmed that the existing valve is suitable for steam purging.
• Identified steam, condensate, and blowdown tie-ins via discussions with operations and by red-lining the piping and instrumentation diagrams (P&IDs).
• Optimized the routing and support of the new steam and condensate piping.
Facilitate a long-term solution of replacing the wedge plug valve with a more modern valve.
• Defined the specifications for the new valve.
• Determined the extent of piping and structural modifications needed to install the new valve.
• Defined the E&I scope required to integrate the new valve and actuator into the existing control system.
• Submitted a scoping study report and schedule.
• Provided a Class 4 capital cost estimate (CAPEX).